File list
Jump to navigation
Jump to search
This special page shows all uploaded files.
| Date | Name | Thumbnail | Size | User | Description | Versions |
|---|---|---|---|---|---|---|
| 21:08, 10 December 2024 | CV Vrieze.doc (file) | 174 KB | Scott (talk | contribs) | 2 | ||
| 21:50, 20 October 2021 | VriezeLab-Group-2021-1.jpg (file) | Error creating thumbnail: /web/genome.psych.umn.edu/vendor/wikimedia/shellbox/src/Command/limit.sh: line 57: ulimit: cpu time: cannot modify limit: Permission denied
/web/genome.psych.umn.edu/vendor/wikimedia/shellbox/src/Command/limit.sh: line 84: ulimit: file size: cannot modify limit: Permission denied
/bin/bash: line 1: /usr/bin/convert: No such file or directory
Error code: 127 |
676 KB | Scott (talk | contribs) | 1 | |
| 22:08, 14 January 2021 | CoTwins Project Milestones (2).jpg (file) | 47 KB | Rio Hindami (talk | contribs) | Update 1/14/21 | 2 | |
| 17:34, 14 January 2021 | Data Impact Chart.jpg (file) | 129 KB | Rio Hindami (talk | contribs) | Updated 1/14/21 | 2 | |
| 14:40, 23 July 2020 | CoTwins Data Impact Complete.xlsx (file) | 48 KB | Rachel Schneider (talk | contribs) | 1 | ||
| 13:02, 9 July 2020 | Resolved Software and Bug Reports CoTwins.docx (file) | 10 KB | Rachel Schneider (talk | contribs) | 1 | ||
| 12:22, 9 July 2020 | CoTwins Project Milestones.jpg (file) | 203 KB | Rachel Schneider (talk | contribs) | 1 | ||
| 12:17, 9 July 2020 | CoTwins Project Milestone Chart Page 1.jpg (file) | 156 KB | Rachel Schneider (talk | contribs) | 1 | ||
| 19:03, 23 June 2020 | CoTwins Project Milestone Image small.jpg (file) | 142 KB | Rachel Schneider (talk | contribs) | 1 | ||
| 18:57, 23 June 2020 | CoTwins Project Milestone Image.jpg (file) | 27 KB | Rachel Schneider (talk | contribs) | 2 | ||
| 19:17, 10 February 2020 | Psy 8612 Lecture Syllabus 2020.docx (file) | 54 KB | Scott (talk | contribs) | 1 | ||
| 17:31, 29 January 2020 | MaxFreq Formatting ICC.R (file) | 16 KB | Stephanie Zellers (talk | contribs) | R Script to format lifetime maximum cannabis frequency for ICC GWAS prepared by Stephanie Zellers, January 2020. | 1 | |
| 17:31, 29 January 2020 | Last12 Age20 Formatting.R (file) | 16 KB | Stephanie Zellers (talk | contribs) | Script to format last 12 month marijuana frequency for ICC GWAS prepared by Stephanie Zellers | 1 | |
| 12:53, 5 September 2019 | VriezeLab Fall 2019 scaled.jpg (file) | 1.4 MB | Scott (talk | contribs) | 1 | ||
| 02:20, 26 January 2019 | Group photo best fixed sm.jpg (file) | 97 KB | Scott (talk | contribs) | 1 | ||
| 13:24, 20 September 2018 | 2017 all staff photo DSC1943 sm.jpg (file) | 123 KB | Scott (talk | contribs) | 1 | ||
| 20:34, 3 April 2018 | Psy 8612 Lecture Syllabus.docx (file) | 54 KB | Scott (talk | contribs) | 2 | ||
| 22:37, 27 March 2018 | Measurement Invariance.pdf (file) | 2.76 MB | Scott (talk | contribs) | 1 | ||
| 22:30, 27 March 2018 | Path diagram multigroup.png (file) | 141 KB | Scott (talk | contribs) | 1 | ||
| 22:30, 27 March 2018 | Measurement Invariance Path diagram.png (file) | 79 KB | Scott (talk | contribs) | 1 | ||
| 22:27, 27 March 2018 | Measurement Invariance notes.tex (file) | 23 KB | Scott (talk | contribs) | 3 | ||
| 15:27, 22 January 2018 | Psy 8612 Lecture Syllabus.pdf (file) | 47 KB | Scott (talk | contribs) | 1 | ||
| 13:29, 13 November 2017 | MOA 2017.jpg (file) | 853 KB | Scott (talk | contribs) | 1 | ||
| 20:09, 26 October 2017 | VriezeLab Fall 2017 scaled.jpg (file) | 1.16 MB | Scott (talk | contribs) | 1 | ||
| 19:21, 6 June 2017 | 2017 CU Group.jpeg (file) | 1.25 MB | Scott (talk | contribs) | 2 | ||
| 13:20, 2 June 2017 | GSCAN GWAS ANALYSIS PLAN-v1.4.docx (file) | 451 KB | Scott (talk | contribs) | 1 | ||
| 01:31, 20 December 2016 | TOPMed Smoking Analysis Plan-v0.2.docx (file) | 57 KB | Scott (talk | contribs) | 2 | ||
| 00:29, 7 October 2016 | AddHealthDPWSpaghetti.jpg (file) | 122 KB | Maia Frieser (talk | contribs) | 4 | ||
| 00:22, 7 October 2016 | AddHealthDPW.jpg (file) | 49 KB | Maia Frieser (talk | contribs) | Harmonized | 3 | |
| 02:37, 6 October 2016 | AddHealthCPDSpaghetti.jpg (file) | 215 KB | Maia Frieser (talk | contribs) | Spaghetti plot for AddHealth CPD over time, jittered. | 1 | |
| 02:28, 6 October 2016 | AddHealthCPD.jpg (file) | 79 KB | Maia Frieser (talk | contribs) | CPD measures for all 4 waves of AddHealth | 1 | |
| 21:31, 30 September 2016 | MLSDPW.jpeg (file) | 263 KB | Maia Frieser (talk | contribs) | Jittered spaghetti plot of DPW for MLS | 1 | |
| 20:32, 29 September 2016 | MLSCPD.jpeg (file) | 248 KB | Maia Frieser (talk | contribs) | Jittered spaghetti plot for MLS CPD over test. | 1 | |
| 16:25, 28 September 2016 | GSCAN GWAS ANALYSIS PLAN-v1.3.docx (file) | 456 KB | Scott (talk | contribs) | 1 | ||
| 21:42, 23 September 2016 | Cpdltssexvar.jpeg (file) | 125 KB | Maia Frieser (talk | contribs) | Log-transformed, sex-controlled CPD variables for LTS waves 2-3 | 1 | |
| 21:30, 23 September 2016 | Cpdctssex.jpeg (file) | 154 KB | Maia Frieser (talk | contribs) | Log-transformed and sex-controlled CPD variables for CTS waves 2-3. | 1 | |
| 00:17, 21 September 2016 | SexvarLTSDPW.jpeg (file) | 275 KB | Maia Frieser (talk | contribs) | Sex-corrected log-transformed LTS DPW variables. | 1 | |
| 22:50, 20 September 2016 | Sexvardpw.jpeg (file) | 477 KB | Maia Frieser (talk | contribs) | Sex-controlled log-transformed correlation matrix of CTS DPW variables. | 1 | |
| 17:25, 20 September 2016 | LogCTSDPW.jpeg (file) | 489 KB | Maia Frieser (talk | contribs) | Log transformed scatterplot matrix of measured and computed DPW vars. | 1 | |
| 20:19, 13 September 2016 | FTP AlcFreq.jpeg (file) | 545 KB | Maia Frieser (talk | contribs) | Alcohol Frequency by age for FTP | 1 | |
| 20:09, 13 September 2016 | FTP TobFreq.jpeg (file) | 599 KB | Maia Frieser (talk | contribs) | Tobacco Frequency by age | 1 | |
| 20:14, 6 September 2016 | CADD table.jpg (file) | 179 KB | Maia Frieser (talk | contribs) | CADD sample | 1 | |
| 22:26, 31 August 2016 | LTS12DPW.jpeg (file) | 92 KB | Maia Frieser (talk | contribs) | Added 0s | 2 | |
| 21:53, 31 August 2016 | CTS12DPW.jpeg (file) | 93 KB | Maia Frieser (talk | contribs) | Added 0 DPW drinkers. | 2 | |
| 00:07, 31 August 2016 | LTS DPW23 Spaghetti.jpeg (file) | 325 KB | Maia Frieser (talk | contribs) | Spaghetti plot of DPW for LTS waves 2 and 3. | 1 | |
| 00:06, 31 August 2016 | LTS23DPW.jpeg (file) | 90 KB | Maia Frieser (talk | contribs) | Histograms of DPW for LTS waves 2 and 3. | 1 | |
| 00:02, 31 August 2016 | CTS DPW23 Spaghetti.jpeg (file) | 343 KB | Maia Frieser (talk | contribs) | Spaghetti plot of DPW for CTS waves 2 and 3. | 1 | |
| 23:59, 30 August 2016 | CTS23DPW.jpeg (file) | 84 KB | Maia Frieser (talk | contribs) | Distributions of DPW for CTS waves 2 and 3. | 1 | |
| 23:52, 30 August 2016 | LTS DPW12 Spaghetti.jpeg (file) | 81 KB | Maia Frieser (talk | contribs) | Spaghetti plot of DPW for LTS waves 1 and 2. | 1 | |
| 23:50, 30 August 2016 | CTS DPW12 Spaghetti.jpeg (file) | 327 KB | Maia Frieser (talk | contribs) | Spaghetti plot of DPW for CTS waves 1 and 2. | 1 |